Accomplished This week
C1
- Began writing final/testing report
- Changed questions to suit a the outdoor theme
- Finished all rooms and added questions
C2
- Completed all levels of program and sent it to Ian and Mark for Compiling
- ahsan and brett are working on a portion of the design manual
- did preliminary work on final report
C3
- Accomplished this week:
- Finished the mini games to be put into the desert world Finished the whole desert world Tested and played through the world to find any bugs - Started integrating the whole game together (Ian)
C5
- Familiarized ourselves with Game Maker 8, its functions, and its codes.
- Did the three mnemonic games and one group interface for our work package and compiled them together.
- Did a brief testing for the compiled C5 Memory 2 work package.
C6
-completed 16 levels of game
-finished compiling our game
-began testing
-prepared instructions
-began preparing for Monday's presentation
C8
- Completed testing and constructing of games
- Submitted games and interfaces to be compiled
- Working on user manual and final report
C9
-completed game and did functional requirement testing
To Be Accomplished Next Week
C1
- Help with the manual and poster if need be
- Prepare for the presentaion of our level on monday
- Writing the Final/Testing Report.
C2
- Complete final report
- complete our section of the design manual (by Sunday)
- present our portion of the program in the lab on Monday
C3
- Finish manual (Triet)
- Finish Poster (Salman)
- Start Final Report
- Prepare for open house
- Test the whole game package for any bugs
C5
- Further testing and debugging of our group's work package.
- Preparation for the presentation of Lab's program in Monday and for the Open house.
- Assist making the User Manual and the Poster by sending in our group's description of our work package.
- Writing the Final/Testing Report.
C6
- present program in Monday’s lab
- complete final report
- organize and complete the poster for the presentation
C8
- Complete and submit sections for interface
- Prepare and present section of game on demo day
- Prepare for open house
C9
-do intro to lab presentation of game
-Have rough draft of final report done
-complete duties outside our group such as Lab User Manual and compilation of game.
Friday, April 9, 2010